Downtown Mixed-Use Development

Greenville, South Carolina

Project Description
Bunnell-Lammons Engineering (BLE) played a pivotal role in the Camperdown development, a transformative $175 million mixed-use project located in the heart of downtown Greenville, South Carolina. The development features a blend of structures, including a 3-level underground parking garage, a 7-story hotel, a 7-story apartment building, a 4-story office building, a 12-story office tower topped with 4 stories of condominiums, and a vibrant public plaza with retail shops. The project’s complexity and scale demanded a comprehensive engineering and environmental approach to ensure safety, stability, and regulatory compliance.

Project Scope of Work
BLE’s involvement encompassed a full spectrum of geotechnical engineering, environmental consulting, construction materials testing, and special inspection services. The geotechnical investigation was extensive, involving soil test borings with standard penetration tests, water table determinations, and rock coring to evaluate the quality and competency of the bedrock beneath the site. Based on these analyses, BLE recommended a bearing pressure of 50,000 psf for the project footings, enabling the transfer of structural loads directly to competent bedrock and ensuring a stable foundation system.

Throughout construction, BLE provided critical monitoring of blasting and rock excavation activities to safeguard site integrity and nearby structures. The team also conducted meticulous inspections of project footings to verify that the recommended bearing conditions were met. BLE’s construction materials testing and special inspections covered soils, concrete, post-tension cable systems, masonry, and structural steel installation, maintaining rigorous quality control and safety standards.

In addition, BLE expertly managed the South Carolina Brownfields contract for the site, delivering comprehensive environmental site assessments, remediation planning, and ensuring full compliance with environmental regulations. This environmental oversight was essential to address challenges stemming from the property’s prior uses and to facilitate a smooth development process.

Project Outcome
BLE’s comprehensive suite of services was instrumental in the successful delivery of the Camperdown development. By integrating proactive geotechnical investigations, vigilant construction quality assurance, and expert environmental management, BLE minimized project risks and optimized performance. The collaborative approach with the project team fostered innovative solutions and upheld the highest standards of quality and safety.

As a trusted partner to the City of Greenville, BLE’s contributions ensured the structural integrity and environmental compliance of this landmark project, ultimately supporting the creation of a vibrant, mixed-use community space that enhances downtown Greenville. The Camperdown development stands as a testament to BLE’s commitment to excellence, client satisfaction, and delivering exceptional value on complex, high-profile projects.