Lake Blalock Dam

Lake Blalock Dam

Spartanburg, South Carolina – BLE provided subcontract geotechnical exploration services for the rehabilitation and upgrade to the pre-existing dam and spillway. Our services included performing a geotechnical exploration (soil borings, standard penetration test sampling, undisturbed sampling, test pits) and providing recommendations for filters, drains, rock anchors, lateral earth pressures, slope stability, site preparation, and piezometer…

Read More

Greenville Federal Courthouse

Greenville U.S. Courthouse

Greenville, South Carolina – BLE provided geotechnical engineering services for the proposed new six-story Federal Courthouse project located in Greenville, South Carolina for the General Services Administration (GSA). This project was authorized by Congress along with several other Courthouses in the Southeast Sunbelt Region with a construction cost of $105 million dollars. This facility will…

Read More

Arch Culvert & Geogrid Reinforcement Wingwalls

Arch Culvert

Greenville, South Carolina – BLE provided geotechnical exploration, laboratory testing, and construction monitoring and testing for an arch culvert and associated geogrid-reinforced wingwalls providing roadway access to a new landfill area. The arch culvert is approximately 35 feet tall and 200 feet long. The geotechnical exploration indicated that foundation conditions consisted of 6 to 12…

Read More

Underground Storage Tank Closure Assessment

Underground Storage Tank Removal

Liberty, South Carolina – The subject underground storage tanks were located on the property at the southeastern intersection of US Highway 178 and SC Highway 93 in Liberty, South Carolina. With a total of four underground storage tanks, three were removed from the ground and transported off-site, and the fourth tank was closed in-place with…

Read More

Tank Removal and Waste Management

Underground storage tank removal

Clemson, South Carolina – BLE managed the removal of 28 out-of-service heating oil tanks from a former housing complex. Petroleum contaminated soil from beneath the tanks was evaluated in the field, excavated as needed, and properly disposed of at a permitted waste management facility. Approximately 2,900 tons of petroleum impacted soil was transported offsite for…

Read More

Parking Lot Pavement Evaluation

Pickens County School Bus Parking Lot

Pickens County, SC – The School District of Pickens County established funds to replace the distressed asphalt pavement at the existing school bus parking lot located at 688 Pumpkintown Highway in Pickens, South Carolina. The purpose of the study was to provide an assessment of the existing pavement section, the underlying subgrade condition, and provide…

Read More

Drum Removal & Hazardous Waste Assessment

Drum Removal and Hazardous Waste Assessment completed by Bunnel Lammons Engineering

Simpsonville, South Carolina – During grading activities associated with the development of residential lots, buried 55-gallon drums were discovered. Over the following month, BLE worked closely with government agencies to characterize, excavate, and properly dispose of the drums and their contents as well as evaluate environmental site conditions following the removal of the drums. BLE…

Read More

100+ Automotive Dealerships – Phase I ESA

Former Automotive Dealership

BLE has performed over 100 Phase 1 ESAs on automotive sales and maintenance facilities for a commercial client spanning 21 states throughout the U.S. In addition, BLE has performed over 10 Phase II ESAs, in-ground hydraulic lift removal, and contaminant remediation in support of the property acquisitions. Our staff of experienced professionals recognize the time-critical…

Read More